Author / !9Admin2017
-
Waste Transfer Station
124 tons SteelWaste Handling FacilityClient: Mackay City Council, Rimco Building Systems
April 19, 2021 -
Bridge Repair Launders Creek
38 ton steel bridge beamsBridge rectification works on flood damaged bridgesClient: RMS Engineering
April 19, 2021 -
Blackwoods
33 ton tiltpanels100 ton all terrain hydralic installationClient: SAW Formwork, Lancini Group
April 19, 2021 -
Black Star Ore feed
350 meter conveyer system rising 112 mtrsConveyer System Client: Xtrata & Mineforce
April 19, 2021
Loading posts...
Categories
- Mechanical Installation (1)
- Rigging (2)
- Structural Steel (2)
- Tilt Panel (1)
Comments.